Tuesday, 8-25-09 - Took picture above of the new view of the house after the rock wall was installed. We'll have plants, trees and flowers in the area between the two big rocks. The picture below shows the different planting levels and where the sidewalk will go around to the front door.Sunday, September 6, 2009
Rock Wall 9-6-09
Tuesday, 8-25-09 - Took picture above of the new view of the house after the rock wall was installed. We'll have plants, trees and flowers in the area between the two big rocks. The picture below shows the different planting levels and where the sidewalk will go around to the front door.Kitchen Counter / Bathroom Tiles, 9-6-09
Friday, 8-21-09 - They installed the kitchen counter today. You can see the double sinks and where the white cook top stove will be. There is room for seating around the entire counter. We're busy looking for counter stools.
Thursday, 8-27-09 - Took these pictures of my bathroom shower and tub. I love the blue glass tiles and how they surround the windows. There will be glass block walls enclosing the shower area when completed.
Friday 9-4-09 - The picture below is one wall of the shower in the guest bathroom. The "blank" square shapes will be filled in with glass tiles (orange, light green & dark violet combo). There will be a large shower head in the ceiling and the shower floor will be natural rock. I'll get a better picture when it's all done.Thursday, August 6, 2009
Garage Doors - Murphy Bed 8-6-09
More Cabinets 7-25-09
Saturday, 7-25-09 - Here's the rest of the cabinets. Above are the oak cabinets in my bathroom. Framing for tub on the left. Below are the oak cabinets in the guest bathroom.
Below is the laundry room. The little door on the left is the laundry chute from Ted's bathroom.
Took the picture below this morning (8-6-09). Bill will be doing all of the tile work in the bathrooms, including the slate flooring in the entryway hall, laundry room, guest bathroom and kitchen. Right now he's working on the shower pan in Ted's bathroom. The other shower pans are done and ready for the tile.
Saturday, July 25, 2009
Cabinets 7-24-09
Friday, 7-24-09 - Ted's bookcase room divider was assembled today. There are shelves on both sides and the big screen TV will swivel around to face his bedroom area. (It's currently facing his office area.) The picture below is his bathroom cabinets and the laundry chute on the left opens into the laundry room on the other side of the wall. All the other bathroom cabinets are oak and are installed, but I only have room for 4 pictures so they will have to wait. :)
Jim, our cabinet installer is busy putting some finishing touches on the kitchen cabinets. You can see where the oven stack will go in the cabinets on the right, and right next to that is the pantry, and next to that is where the frig will go. The counter he's working on will house the cooktop stove, double sinks and the dishwasher. Check out the cool skylight!Saturday, July 18, 2009
GypCrete and Deck Posts 7-18-09
Saturday, July 11, 2009
Siding - Inside Painting 7-10-09
Friday, 7-10-09 - Hello again! The scaffolding came down yesterday and the stone siding is basically done. The plywood you see is where the sliding glass doors are going when they arrive (production problem delay). All of the other windows are in. In the picture below you can see all the sheetrocking is done, and they finished painting the entire inside of the house yesterday. On Monday they will begin installing the in-floor heating system.
Subscribe to: