Wed. 11-5-08 - Stopped by the site a 11:30 a.m. They were spraying the waterproof coating on the foundation walls.

Next he installed the moisture barrier on the up-hill side of the foundation.

Another 2-man crew was working on installing the sewer pipe. The picture below shows the very long ditch that was required.