Friday, March 27, 2009

Windows 3-10-09

March 10, 2009 - The roof is all ready for the tiles and the Tyvek is up on the outside of the house.
All the re-bar is down in preparation to pour the concrete slab in the garage.

These pictures show that all the windows have been installed. (Except the floor-to-ceiling ones across the front. They will be special ordered later.)



No comments: