The Final Week 10-17-09

Saturday 10-17-09 - Ted really likes how his new work benches turned out. He can hardly wait to start unpacking all of his tools. The extra pantry and freezer by the door is all hooked up and ready to go.

In the picture above you can see the wood paneling has been installed on the refrigerator and the oven stack is installed and ready to use. In the picture below Jim in about to install the wood paneling on the dishwasher. The carpet is installed in the living room, both bedrooms and walk-in closets.

Below is a picture of our newly built mail box. I don't think we have to worry about driveby damage from baseball bats. :) The contractors have been extremely busy these past two weeks (including weekends) trying to get things finished before next Friday, October 23rd because we are moving in that day - ready or not.





1 comment:

Unknown said...

Thanks for posting the pictures! The house really looks great! I'm sure it'll be a relief after your all settled in. I hope this Friday brings with it some good weather.