Showing posts with label Ground Breaking Day 9-23-08. Show all posts
Showing posts with label Ground Breaking Day 9-23-08. Show all posts

Tuesday, September 23, 2008

Official Ground Breaking Day 9-23-08


9-23-08 - He just scraped out our new driveway. They began bringing in truckloads of fill dirt and dumping it in the driveway before loading the trucks up with limbs to haul away.
9-23-08 - Hauling all the trees away & digging a trench for the rolls of hay that will absorb the construction runoff.


They brought in this 'big guy' to dig out the stumps and put in the trucks to haul away.



Dumping the load of fill dirt first while 'big guy' is waiting to load up with tree limbs. Quite the production line they have going. Very efficient.




This gives a good idea of how big the tree was that he just cut down. The 2 trees directly behind are next.


They had hauled the big tree away and now down comes the other 2 trees.