Wednesday, May 13, 2009

Stone Siding - Electrical 5-12-09

Tuesday, 5-12-09 - The Cronin Stone siding is going up. They have completed the guest bedroom/bathroom and are starting on my corner master bathroom. These pictures really don't do it justice - the stone is really beautiful!

I haven't updated the blog lately because most of the work is being done on the inside and under the house (plumbing rough-in, venting, electrical, etc.) and they aren't very pretty pictures. In the picture below you can see a lot of the canned lights in the ceiling and the wiring in the walls. The scaffolding is all the way up to the roof line of the prow (left of fireplace).
Picture below is framed Murphy Bed in the guest bedroom. There are 3 canned lights over what will be the 86" x 45" work/craft table that can be folded out when the bed is closed up in the wall. This table will get a lot of use for photo album updates, art work, etc. The electrician is installing more switches and outlets.





Friday, April 17, 2009

New Front Door 4-17-09

Friday, 4-17-09 - New new front door was installed yesterday, and looks fantastic! I'm standing in the entryway (kitchen on the right). Below they are installing the deck flooring outside of Ted's suite. The white tyvek on the right is the fireplace in the greatroom.
4-9-09 - Ted is moving his things into the garage of our rental. Most of it went into a storage unit in town.
4-6-09 - Took picture below of Ted's newly installed glass block window in his bathroom. The sun comes up on that side of the house so he'll get the morning light. The open window to the right is the laundry room window.





Tuesday, March 31, 2009

Inside of House 3-29-09

Sunday, 3-29-09 - In the picture above I'm standing in the corner of my bedroom/office suite looking toward the fireplace in the great room on the left, and through the door on the right you can see the kitchen counter framing. The light beyond the far wall is the doorway into the garage. In the picture below I'm standing in the corner of Ted's bedroom/office suite, great room fireplace on the right and through the door you can see the kitchen counter framing and the doorway to the pantry.

Below is a picture of the kitchen. You can see the pantry and framing for the kitchen counter. (They already have it plumbed for the sink.) There will be a big 8' skylight over the center of the kitchen. Through the doorway on the right you can see where I was standing when I took the first picture.

In picture below I'm standing in the kitchen beside where the cooktop stove will be, facing the great room. (That funny crown looking thing on the fireplace is just a piece of wood left there by the framer, not a part of the fireplace.) Anyway, these pictures will give you an idea of the layout of the inside of the house. The guest bedroom/bathroom are down the hall behind the kitchen. You can kind of see it in the picture of the kitchen.



Friday, March 27, 2009

Garage Slab 3-16-09 - Tile Roof 3-17-09

March 17, 2009 - The tiles are being transferred onto the roof. They had quite a crew working that first day. It slowed down a little after that.

3-16-09 - The painter was getting all the soffits painted before the roofers arrived. Even with the ladder extended all the way, he still needed an extension on his paint roller. I almost got vertigo from just taking this picture! Way too high up there for me!

3-16-09 - The concrete for the front porch and garage was poured today. They were just finishing up late this afternoon. Of course I had to put our initials in the corner of the garage. :-)





Windows 3-10-09

March 10, 2009 - The roof is all ready for the tiles and the Tyvek is up on the outside of the house.
All the re-bar is down in preparation to pour the concrete slab in the garage.

These pictures show that all the windows have been installed. (Except the floor-to-ceiling ones across the front. They will be special ordered later.)



Friday, March 6, 2009

Roofers - Plumbers 3-6-09

Tuesday, 3-3-09 - The roofers started laying the pad and wood strips down on Tuesday, and they finished on Wednesday (picture below). When the tiles arrive all they have to do is hook them over the wood strips (no nails required). I'm really learning a lot from overseeing this little project. :) As you can see, it's starting to look like a real house.

Friday, 3-6-09 - The plumbers started working on 3-3-09 and are still going strong. Should finish up next week. I'm busy picking out tubs, sinks, faucets, etc. etc. Next week they will be pouring the concrete slab in the garage, then I'll have my first walk-through with the electricians to go over the electrical plan.

These pictures give you an idea of the openness that the floor-to-ceiling windows will give us from the master suites and great room in the center, and the deck will have the glass railing so we'll have unobstructed views of the water and Canada.






Friday, February 20, 2009

Roof Half Done 2-20-09

Thursday, February 12, 2009 - The trusses are going up fast.

Sunday, 2-15-09 - Ted came over for Valentine's Day weekend and walked through the house for the first time. He's standing at the corner of his suite where the floor-to-ceiling windows will go. I'm standing at the corner in my suite. Fantastic view in all directions.

Friday, February 20, 2009 - Drove up the hill this afternoon and took picture below. The roof is almost halfway done. If you look close you can see where the 3 skylights are going to be (covered with a piece of particleboard).