Tuesday 12-30-08 - Drove up the hill around noon today to see how things are progressing and they are moving right along with the framing of the basement.The picture below shows several deer that were grazing & resting on the lot.

Mon. 12-15-08 - They delivered the lumber on Friday (12-12) in anticipation of the snow. I drove by on Monday and took the picture above.Tue. 12-16-08 - On the way up the hill this morning I stopped to snap this picture of Hurricane Ridge. Such an incredibly beautiful (& cold) day.
The pictures below show the 1 framer working today. He said he would be working tomorrow as well, in spite of the forecast for snow. The basement slab looked like you could go skating on it.
Wed. 11-19-08 - Drove up at 12:45 pm to check things out. They have dug the ditch to run the power from the new box to the house. Picture above I'm standing by the box facing the house. Picture below I'm in the garage facing the box.
Tuesday, 11-11-08 - I'm standing at our "Front Door" taking above picture. In the picture below the top of the backhoe machine in the center of picture shows where the front door is.