Wednesday, May 13, 2009

Stone Siding - Electrical 5-12-09

Tuesday, 5-12-09 - The Cronin Stone siding is going up. They have completed the guest bedroom/bathroom and are starting on my corner master bathroom. These pictures really don't do it justice - the stone is really beautiful!

I haven't updated the blog lately because most of the work is being done on the inside and under the house (plumbing rough-in, venting, electrical, etc.) and they aren't very pretty pictures. In the picture below you can see a lot of the canned lights in the ceiling and the wiring in the walls. The scaffolding is all the way up to the roof line of the prow (left of fireplace).
Picture below is framed Murphy Bed in the guest bedroom. There are 3 canned lights over what will be the 86" x 45" work/craft table that can be folded out when the bed is closed up in the wall. This table will get a lot of use for photo album updates, art work, etc. The electrician is installing more switches and outlets.